HACCP planning
Verification, document review and record register
Schedule verification, control document versions and make completed records easy to retrieve.
Free to use and adapt. Includes blank records, instructions and fictional examples.
Version 1.0 · Source guidance reviewed 18 September 2026
Hospitality · Food manufacturing · Food retail · Warehousing · Transport · Institutional food service
How to use this template
- List verification activities, responsible reviewers, frequency and evidence required. Keep verification distinct from routine monitoring.
- Record actual review dates, findings and linked corrective actions. Include checks of control effectiveness, not just whether fields are filled in.
- Register document owners, approved versions and review dates. Remove obsolete copies from operational use while retaining required historical evidence.
- Define record locations, access and retention periods using applicable legal, customer and business requirements. Do not apply one retention period to every industry.
Inside the pack
Use the blank forms for your own records. The examples below show how fields are used; they are fictional and do not prescribe operational limits.
Verification schedule
Assign an appropriate reviewer, independent of monitoring where practicable, and record evidence of the review.
See fields and worked example
- Activity / criteria
- Review storage records and deviations
- Frequency / due date
- Weekly / 21/09/2026
- Reviewer
- JT
- Review date / evidence
- Pending
- Findings / action ID
- Open until reviewed
- Next review / closure
- To set after review
Document register
Record approved versions and how both current documents and historical records can be retrieved.
See fields and worked example
- Document / record ID
- CL01 cleaning procedure
- Owner / approved version
- JT / version 2
- Location / access
- Controlled site folder
- Retention requirement / basis
- Site retention policy RP01
- Review date / approver
- 18/09/2026 / JT
- Obsolete copy action
- Version 1 removed from work area; archived
Before you use it
Verification checks whether the system operates as intended; validation establishes that a control can achieve the intended outcome. Set review and retention requirements for your operation rather than assuming a universal interval.
Adapt these supporting records to your products, processes and approved food safety plan. They are not HACCP certification or a complete site-specific food safety program. Establish and validate limits with a competent person before use. Examples are fictional and are not prescribed limits.
